The engineer who drew it can walk to the bay where it is being built. That single fact removes more revision cycles than any software we have ever bought.

Combined campus area
34,000 m²
Maximum single-piece weight
65 t
Maximum vessel diameter
4.5 m
Qualified welders
148
Two campuses

Split by what the work physically requires.

Sanand, Ahmedabad20,000 m²

Unit I — Precision Filtration Campus

Element production, sanitary and cleanroom assembly, light and medium vessels, skid build and factory acceptance testing.

  • ISO Class 8 cleanroom
  • Integrity test laboratory
  • Skid assembly and FAT bays
  • Electropolishing line
Savli, Vadodara14,000 m²

Unit II — Heavy Fabrication Campus

Large-diameter code vessels, thick-plate work, weld overlay and clad construction, post-weld heat treatment and heavy transport.

  • 80 t overhead cranes
  • 6 m PWHT furnace
  • Plate rolling to 80 mm
  • Radiography bunker
Capability envelope

What we can physically build

34,000 m²
Combined campus area
80 mm × 3,000 mm
Plate rolling capacity
4.5 m
Maximum vessel diameter
65 t
Maximum single-piece weight
6.0 m
PWHT furnace length
80 t
Overhead crane capacity
ISO Class 8
Cleanroom assembly
148
Qualified welders
Manufacturing

Eight stages between raw plate and a code-stamped vessel.

Every stage produces a document. The vessel and its data book are built at the same time, not in sequence.

01

Material receipt & verification

Every plate, pipe and forging is verified against its EN 10204 3.1 or 3.2 certificate and positive material identification is performed before it enters the shop.

PMI by handheld XRF on 100% of alloy material. Heat numbers transcribed to the traceability record at receipt, not at dispatch.

02

Cutting & forming

CNC plasma and laser cutting, plate rolling to 80 mm, and hot and cold forming of dished heads under controlled procedure.

Cut edges dressed and inspected. Forming strain calculated and, where required, followed by solution annealing to restore properties.

03

Welding

SAW, GTAW, GMAW and SMAW under procedures qualified to ASME Section IX, executed by welders requalified every six months.

Weld maps issued before fitting. Consumable control by batch with heat-number recording on each joint.

04

Non-destructive testing

Radiographic, ultrasonic, magnetic particle and dye penetrant examination to the extent defined in the inspection test plan.

Level II and III certified technicians in-house. Film and scan data retained and issued with the data book.

05

Heat treatment

Post-weld heat treatment in a calibrated 6 m furnace with continuous chart recording, plus solution annealing for austenitic and duplex work.

Thermocouple placement per procedure. Charts reviewed and signed before release to the next stage.

06

Surface finishing

Shot blasting, pickling and passivation, mechanical polishing to 320 grit, and electropolishing to Ra ≤ 0.4 µm for sanitary work.

Surface roughness verified by profilometer on sanitary vessels and recorded against each internal surface.

07

Pressure & integrity testing

Hydrostatic proof at 1.5 times design pressure, helium leak testing where specified, and functional testing of all instrumentation.

Calibrated gauges with certificates traceable to national standards. Hold times recorded on the test certificate.

08

Assembly, FAT & dispatch

Skid assembly, wiring, factory acceptance testing on water, and preservation and packing for the destination and transit mode.

FAT witnessed by client or third party where required. Data book compiled, indexed and issued before dispatch.

Interactive factory tour

Walk the floor without booking a flight.

Six stations across both campuses — the rolling bay, the weld shop, the radiography bunker, the PWHT furnace, the cleanroom and the FAT hall.

Station 01

Plate preparation & rolling

CNC cutting, edge dressing and rolling to 80 mm plate.

Station 02

Weld shop

SAW, GTAW and GMAW under procedures qualified to ASME IX.

Station 03

Radiography bunker

In-house RT with Level III oversight and film retention.

Station 04

PWHT furnace

Calibrated 6 m furnace with continuous chart recording.

Station 05

Cleanroom assembly

ISO Class 8 element build with WFI-quality flushing.

Station 06

FAT hall

Skid running on water, witnessed by client or third party.

Book a live walkthrough

Video walkthroughs run weekly · 45 minutes with the plant manager

Manufacturing

Bring your inspector.

Client and third-party hold points go into the inspection test plan at kick-off, scheduled with at least ten days' notice. We would rather you watched.