High solids abrasive slurry
Concentrations above 30% by weight erode conventional wetted parts within weeks unless hardened or lined.
Slurry dewatering, process water recovery and dust control engineered for remote sites where spares take weeks to arrive.
The constraint
Mine sites operate far from support. Equipment must run with minimal intervention, tolerate abrasive slurries at high solids, and be repairable with what is physically on site.
Standards we work to
Concentrations above 30% by weight erode conventional wetted parts within weeks unless hardened or lined.
A part not on site is a part four weeks away, so designs favour common components and field-serviceable assemblies.
Process water recovery is frequently a licence condition, making recovery efficiency a compliance issue rather than an economic one.
Crushing and conveying generate silica-bearing dust with occupational exposure limits that dictate capture design.
Next step
Our applications engineers work to the standards listed above every week. You will not be explaining your industry from first principles.
Or call +91 79 4890 2200 · sales@worldasatech.com